Our company produce vertical turbine pump,vertical long axis pump, vertical type condensate pump ,vertical wet pit pump,right Angle gear box.
Date:2022/7/16 22:12:03
Views:
Installation of RV-SP Landfill Leachate Pump
1. Check all parts for defects. All paper cushions should be coated with thin butter on both sides. Two thirds of the butter should be added to the bearing.
2. The skeleton oil seal must be filled with butter, then put into the pump seat, and then installed with bearings.
3. Butter is applied after O-ring is installed in axle sleeve.
4. Install the bearing on the motor base, put the paper cushion, oil retaining ring, and fix the shaft and supporting cylinder with screw.
5. Put paper cushion on, install bearing, bush, key, pump seat and impeller, rotate impeller by hand after tightening impeller nut, and turn flexibly.
6. Put paper cushion on pump housing, fix with screw and install filter screen. Then the impeller is pulled by hand, and the rotation is flexible.
7. Pump shaft is equipped with keys and driven couplings, motor shaft is equipped with keys and active couplings, and then motor and motor seat bolts are fixed. After installation, the axial clearance between the active coupling and the driven coupling should be 1-1.5 mm.
Copyright 2002-2022 Vertical Turbine Pump Manufacturers All Rights Reserved.
073184800558
073184810558
008618507312158
008613974960765
Wechat QR code